Smd 5050 90*120 Degree Lens 28in1 For Outdoor Led Tunnel Light
Quick detail
Product Name: | CM-SZ23670-A90*120°-28H1 | Beam Angle: | 90*120°Degree |
Efficiency: | 92% | Material: | PC |
LED Chips | 5050 | Dimmable: | L236*W70 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module | ||
Application: | Flood Light,Tunnel Light, Street Light | ||
Other Light Distribution: | 30°/60°/ 90°/90*120°/T2 /T3/ ect |
Description
Specifications
Product Name: | CM-SZ23670-A90*120°-28H1 |
Beam Angle: | 90*120°Degree |
Efficiency: | 92% |
Material: | PC |
LED Chips | 5050 |
Size: | L236*W70 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
Application: | Flood Light,Tunnel Light, Street Light |
Other Light Distribution: | 30°/60°/ 90°/90*120°/T2 /T3/ ect |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery :
Trade Terms: |
EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Application:
Notices:
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
Contact Us at Any Time