High-Power 3737/5050 LED Stadium Light Lenses Professional Optics For Sports Lighting
The professional optics in high-power 3737/5050 LED stadium light lenses are not just about making the field bright; and have different angle(10°/20°/40°/60° )options.they are about precisely shaping and controlling light to To meet the needs of different venues sports organizations , ensuring a top-tier experience for everyone involved.
Quick detail
Product Name: | CM-S520116-A40D-126H1 | Beam Angle: | 40° |
Efficiency: | 92% | Material: | PC |
LED Chips | 5050 | Dimmable: | L520*W116 mm |
Accessory: | SMD LED+GASKET+PCB | ||
Application: | Stadium lighting,Flood Light,Tunnel Light, Street Light, |
Description
Specifications
Product Name: | CM-S520116-A40D-126H1 |
Beam Angle: | 40° |
Efficiency: | 92% |
Material: | PC |
LED Chips | 5050 |
Size: | L520*W116 mm |
Accessory: | SMD LED+GASKET+PCB |
Application: | Stadium lighting,Flood Light,Tunnel Light, Street Light |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery:
Trade Terms: |
EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Application
Notices:
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
Contact Us at Any Time