|
Place of Origin | Zhejiang,China |
Brand Name | ChenMu |
Certification | ROHS,UL,SGS,CE |
Model Number | CM-SZ309-A10-76H1 |
3535 Led 10 Degree 76 N 1 Lens PC Material For Stadium LightIing
Quick detai
Product Name: | CM-SZ309-A10-76H1 |
Beam Angle: | 10° |
Efficiency: | 88% |
Material: | PC |
LED Chips: | 3535 |
Size: | L309*W217.8*W15.5 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
Application: | Stadium LightIing ,Flood Light, |
Description
Specifications
Product Name: | CM-SZ309-A10-76H1 |
Beam Angle: | 10° |
Efficiency: | 88% |
Material: | PC |
LED Chips: | 3535 |
Size: | L309*W217.8*W15.5 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
Application: | Flood Light,Tunnel Light, Street Light |
Other Light Distribution: | 10°/30 °/45°/60°/90°ect |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: |
EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES
Drawing
Application
Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
Contact Us at Any Time