Asymmetric 75*145Degree 80in1 3030 led PC material for Led Street Moudle Lighting
Quick detail
Product Name: | CM-SZ23670-A75*140°-80H1 | Beam Angle: | 75*140°Degree |
Efficiency: | 92% | Material: | PC |
LED Chips | 3030 | Size: | L236*W70 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module | ||
Application: | Street Light,Flood Light,Tunnel Light | ||
Other Light Distribution: | 30°60°/ 90°/60*90°/75*140° ect |
Description:
Asymmetric 75*145Degree 80in1 3030 Led PC Material For Led Street Moudle Lighting
Please use a litter water and soft fabric (air-laid paper) to clean the product if necessary.
The working temperature is -35ºC~+120ºC.
Protect the product from the sun and other ultraviolet ray, as these will lead to aging, change color, crack, etc.
Specifications
Product Name: | CM-SZ23670-A75*140°-80H1 |
Beam Angle: | 75*140°°Degree |
Efficiency: | 92% |
Material: | PC |
LED Chips | 3030 |
Size: | L236*W70 mm |
Accessory: | SMD LED+GASKET+PCB+Heat Sink or Module |
Application: | Flood Light,Tunnel Light, Street Light |
Other Light Distribution: | 30°/60°/ 90°/60*90°/75*140° ect |
Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
Main Maket: | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: |
EXW , FOB , CNF , CIF |
Payment Terms: | T/T , PayPal , Western Union, Moneygram |
Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, |
IES
Drawing
Application:
Notices:
Storage: Do not store in dusty place, or expose under corrosive environment.
Contact: Do not touch the lens surface with bare-hand. Please use gloves to
touch the lenses.
Cleaning: Clean lenses only if necessary. Use only mild soap, water and
soft cloth.Do not use any commercial cleaning solvents.
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
Contact Us at Any Time